State Coalition for Remediation of Drycleaners Site Profiles
Spencer Custom Cleaners, Orlando, Florida
Description
|
This is an active PCE drycleaning site that has been on operation since 1971. The facility is located in a mixed retail commercial/residential setting. Three current/former drycleaning facilities are located within 500 feet of Spencer Custom Cleaners. Remediation Status: Site closed |
Contaminants
Contaminants present and the highest amount
detected in both soil and groundwater.
Contaminant | Media | Concentration (ppb) | Nondetect |
---|---|---|---|
Tetrachloroethene (PCE) | groundwater | ||
Tetrachloroethene (PCE) | soil |
Site Hydrology
Deepest Significant Groundwater Contamination: | 40ft bgs | |
Plume Size: | Plume Length: 115ft Plume Width: 55ft Plume Thickness: 27ft |
|
Average Depth to Groundwater: | 13.5ft |
Lithology and Subsurface Geology
fine-grained sand Depth: 0-6ft bgs 6ft thick Conductivity: 2ft/day Gradient: 0.002ft/ft |
||
silty fine-grained sand Depth: 6-25ft bgs 19ft thick |
||
fine-grained quartz sand Depth: 25-42ft bgs 17ft thick |
||
plastic clay Depth: 42-50ft bgs 8ft thick |
Pathways and DNAPL Presence
Groundwater Sediments Soil DNAPL Present |
Vapor Intrusion Pathway
Has the potential for vapor intrusion (VI) been evaluated? |
No |
|
Has a vapor mitigation system been installed? |
Yes | |
Type of Vapor Mitigation System(s): |
Soil Vapor Extraction |
Remediation Scenario
Cleanup
Goals: |
Soil: PCE - 30 ug/kg Groundwater: PCE - 3 ug/l |
|
Remedy Level: |
Full Scale Remedy |
Technologies
In Situ Soil Vapor Extraction |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Next Steps: Cost to Design and Implement: |
|
Ex Situ Carbon Adsorption |
Date implemented: Final remediation design: Results to date: Next Steps: Cost to Design and Implement: |
Costs
Cost
for Assessment: |
$65,600 | |
Cost
for Operation and Maintenance: |
$52,900 (includes monitoring) | |
Total
Costs for Cleanup: |
$159,600 |
Lessons Learned
Based on a 300 site data set, it appears that approximatley 28.3% of our contaminated drycleaning sites can be closed by soil remediation alone. Sites with low-level groundwater contamination can be closed by excavation/removal of contaminated soil and/or soil vapor extraction. |
Contacts
Aaron Cohen Florida Dept. of Environmental Protection Bureau of Waste Cleanup, MS 4500 2600 Blair Stone Road Tallahassee, Florida 32399 850-245-8974 Aaron.Cohen@dep.state.fl.us Mike Lodato, PG Geosyntec Consultants 14055 Riveredge Drive, Suite 300 Tampa, Florida 33637 Phone: (813) 558-0990 e-mail" Mlodato@geosyntec.com |
Site Specific References
Site Assessment Report: 12/04 Remedial Action Plan: 2/05 Construction Completion Report: 11/05 O&M/Monitoring Reports: 2005 - 2008 |