F -- MID-PLUME GROUNDWATER REMEDIATION AT THE WALTON AND LONSBURY SUPERFUND SITE, ATTLEBORO, MASSACHUSETTS (SOL)
U.S. Army Corps of Engineers, North Atlantic Engineer Division, New England District, Concord, MA
Contract Opportunities on SAM.gov W912WJ26RA001, 2026
Filed Under: Market/Commercialization
Filed Under: Market/Commercialization
This is a total small business set-aside under NAICS code 562910. The U.S. Army Corps of Engineers New England District requires a contractor to conduct mid-plume remediation work at the Walton and Lonsbury Superfund Site in Attleboro, Massachusetts. Specifically, the contractor will be tasked with pre-construction planning and surveys; site preparation, including fencing, clearing, staging, erosion controls, monitoring well protection or abandonment, and construction of a work platform; and construction of the mid-plume treatment transect through excavation, soil management and disposal, mixing and quality control of zero-valent iron and sand, and backfilling with reactive media. Following construction, the contractor will restore the site through capping, grading, slope stabilization, wetland restoration, installation of new monitoring wells, removal of temporary facilities and controls, fence replacement, and repair of affected pavement. The work concludes with vegetation establishment, two semiannual groundwater monitoring events to assess remedy performance, and accommodation of an existing stormwater drain along the treatment transect alignment. The award will be a firm-fixed-price contract. Offers are due by 1:00 PM EST on February 12, 2026. https://sam.gov/workspace/contract/opp/f71745903659413e8d895d8e67fa44fd/view
Contract Opportunities on SAM.gov W912WJ26RA001, 2026
Filed Under: Market/Commercialization
Filed Under: Market/Commercialization
This is a total small business set-aside under NAICS code 562910. The U.S. Army Corps of Engineers New England District requires a contractor to conduct mid-plume remediation work at the Walton and Lonsbury Superfund Site in Attleboro, Massachusetts. Specifically, the contractor will be tasked with pre-construction planning and surveys; site preparation, including fencing, clearing, staging, erosion controls, monitoring well protection or abandonment, and construction of a work platform; and construction of the mid-plume treatment transect through excavation, soil management and disposal, mixing and quality control of zero-valent iron and sand, and backfilling with reactive media. Following construction, the contractor will restore the site through capping, grading, slope stabilization, wetland restoration, installation of new monitoring wells, removal of temporary facilities and controls, fence replacement, and repair of affected pavement. The work concludes with vegetation establishment, two semiannual groundwater monitoring events to assess remedy performance, and accommodation of an existing stormwater drain along the treatment transect alignment. The award will be a firm-fixed-price contract. Offers are due by 1:00 PM EST on February 12, 2026. https://sam.gov/workspace/contract/opp/f71745903659413e8d895d8e67fa44fd/
The Technology Innovation News Survey welcomes your comments and
suggestions, as well as information about errors for correction. Please
contact Michael Adam of the U.S. EPA Office of Superfund and Emergency Management at adam.michael@epa.gov or (703) 603-9915
with any comments, suggestions, or corrections.
Mention of non-EPA documents, presentations, or papers does not constitute a U.S. EPA endorsement of their contents, only an acknowledgment that they exist and may be relevant to the Technology Innovation News Survey audience.