For more information on Optimization, please contact:
Kirby Biggs
Technology Integration and Information Branch
PH: 202-823-3081 | Email: biggs.kirby@epa.gov
Technology Integration and Information Branch
PH: 202-823-3081 | Email: biggs.kirby@epa.gov
Site-Specific Optimization Review Reports
Remediation System Evaluation: Millcreek Dump Superfund Site
View reports by: Optimization Stage | EPA Region | Site Name | Search
Optimization Report Summary
MILL CREEK DUMP
ERIE, PA
EPA Region 3
Report Date: 2/16/10
Remediation System Evaluation: Millcreek Dump Superfund Site |
The information presented in the tables below has been extracted from the report. For complete details, view the full report from the link above.
Optimization Stage | Interim Remedy | Date ROD Signed | Responsible Party Type | Tribal Involvement |
---|---|---|---|---|
Remedy Stage Long-term Monitoring Optimization Stage |
No | 5/7/86 | Private | No |
Lead Type | Site Type | Affected Media | Remedies/Technologies | Contaminant Groups |
---|---|---|---|---|
|
|
|
|
|