CLU-IN Home

U.S. EPA Contaminated Site Cleanup Information (CLU-IN)


U.S. Environmental Protection Agency

Site-Specific Optimization Review Reports

Streamlined Remediation System Evaluation: Intermountain Waste Oil Refinery

View reports by:   Optimization Stage | EPA Region | Site Name | Search

Optimization Report Summary

INTERMOUNTAIN WASTE OIL REFINERY Links to a website outside of Clu-In
BOUNTIFUL, UT
EPA Region 8

Report Date:  9/28/11

View Report:  Streamlined Remediation System Evaluation: Intermountain Waste Oil Refinery Streamlined Remediation System Evaluation: Intermountain Waste Oil Refinery

The information presented in the tables below has been extracted from the report. For complete details, view the full report from the link above.

Optimization Stage Interim Remedy Date ROD Signed Responsible Party Type Tribal Involvement
Remedy Stage
No 11/26/02 Private No
Lead Type Site Type Affected Media Remedies/Technologies Contaminant Groups
  • Fund
  • Former Waste Oil Refinery
  • Groundwater
  • Granular Activated Carbon (GAC)
  • Pump and Treat
  • Soil Vapor Extraction
  • 1,2-Dichloroethenes
  • Halogenated VOCs

Top of Page