|
Remediation System Evaluation: 10th Street Superfund Site, OU2 |
2010 |
Remedy Stage |
10TH STREET SITE |
COLUMBUS |
NE |
07 |
|
Remediation System Evaluation: 57th and North Broadway Site |
2006 |
Remedy Stage |
57TH AND NORTH BROADWAY STREETS SITE |
WICHITA |
KS |
07 |
|
Remediation System Evaluation: A-Z Automotive |
2004 |
Remedy Stage |
A-Z AUTOMOTIVE |
WEST MILFORD |
NJ |
02 |
|
Site Optimization Tracker: AIW Frank/Mid-County Mustang Site |
2005 |
Remedy Stage |
A.I.W. FRANK/MID-COUNTY MUSTANG |
EXTON |
PA |
03 |
|
Remediation System Evaluation: Ace Services Superfund Site |
2007 |
Remedy Stage |
ACE SERVICES |
COLBY |
KS |
07 |
|
Optimization Follow-Up: Summary of Phone Conversation |
2013 |
Remedy Stage |
ACE SERVICES |
COLBY |
KS |
07 |
|
Remediation System Evaluation: Alaric, Inc. Superfund Site |
2010 |
Remedy Stage |
ALARIC AREA GW PLUME |
TAMPA |
FL |
04 |
|
Remediation System Evaluation: American Creosote Works Site |
2006 |
Remedy Stage |
AMERICAN CREOSOTE WORKS, INC. (PENSACOLA PLANT) |
PENSACOLA |
FL |
04 |
|
Independent Design Review: American Creosote Works Superfund Site (Winnfield) |
2008 |
Design Stage |
AMERICAN CREOSOTE WORKS, INC. (WINNFIELD PLANT) |
WINNFIELD |
LA |
06 |
|
Final Report: Applied Materials Building 1: Long-Term Monitoring Strategy |
2011 |
Long-term Monitoring Optimization Stage |
APPLIED MATERIALS |
SANTA CLARA |
CA |
09 |
|
Remediation System Evaluation: Baird and McGuire Superfund Site |
2002 |
Remedy Stage |
BAIRD & MCGUIRE |
HOLBROOK |
MA |
01 |
|
DRAFT Optimization Review - Baird & McGuire Superfund Site |
|
Remedy Stage |
BAIRD & MCGUIRE |
HOLBROOK |
MA |
01 |
|
Streamlined Optimization Review - Batesland (Former Mobil Gas Station) Site |
2013 |
Investigation Stage, Investigation Stage, Design Stage, Design Stage |
BATESLAND (FORMER MOBIL GAS STATION) |
BATESLAND |
SD |
08 |
|
Remediation System Evaluation: Bayou Bonfouca Superfund Site |
2001 |
Long-term Monitoring Optimization Stage |
BAYOU BONFOUCA |
SLIDELL |
LA |
06 |
|
Remediation System Evaluation: Baytown Township Superfund Site |
2011 |
Remedy Stage |
BAYTOWN TOWNSHIP GROUND WATER PLUME |
BAYTOWN TOWNSHIP |
MN |
05 |
|
Streamlined Remediation System Evaluation: Benfield Industries Superfund Site |
2007 |
Remedy Stage |
BENFIELD INDUSTRIES, INC. |
HAZELWOOD |
NC |
04 |
|
Optimization Review: Black Butte Mine Superfund Site |
2012 |
Investigation Stage |
BLACK BUTTE MINE |
COTTAGE GROVE |
OR |
10 |
|
Remediation System Evaluation: Bog Creek Farm Superfund Site |
2002 |
Remedy Stage |
BOG CREEK FARM |
HOWELL TOWNSHIP |
NJ |
02 |
|
Optimization Review (LUST Sites) - Bond & Bond/Nav 046 Site |
|
Investigation Stage, Design Stage |
BOND & BOND/NAV 046 SITE |
SHIPROCK |
NM |
06 |
|
Remediation System Evaluation: Boomsnub/Airco Superfund Site |
2002 |
Remedy Stage |
BOOMSNUB/AIRCO |
VANCOUVER |
WA |
10 |
|
Remediation System Evaluation: BP Carson Refinery |
2005 |
Remedy Stage |
BP CARSON REFINERY |
CARSON |
CA |
09 |
|
Remediation System Evaluation: Brewster Well Field Superfund Site |
2002 |
Remedy Stage |
BREWSTER WELL FIELD |
PUTNAM COUNTY |
NY |
02 |
|
Long-Term Monitoring Network Optimization Evaluation: Bunker Hill Mining and Metallurgical Complex Superfund Site, OU2 |
2006 |
Long-term Monitoring Optimization Stage |
BUNKER HILL MINING & METALLURGICAL COMPLEX |
SMELTERVILLE |
ID |
10 |
|
Optimization Review - Bunker Hill and Metallurgical Complex Superfund Site |
2013 |
Remedy Stage |
BUNKER HILL MINING & METALLURGICAL COMPLEX |
SMELTERVILLE |
ID |
10 |
|
Final Report: Technical Assistance for the Burlington Northern Somers Site |
2009 |
Remedy Stage |
BURLINGTON NORTHERN(SOMERS PLANT) |
SOMERS |
MT |
08 |
|
Site Optimization Tracker: Butz Landfill Superfund Site |
2005 |
Remedy Stage |
BUTZ LANDFILL |
STROUDSBURG |
PA |
03 |
|
Streamlined Remediation System Evaluation: Cape Fear Wood Preserving Site |
2005 |
Remedy Stage |
CAPE FEAR WOOD PRESERVING |
FAYETTEVILLE |
NC |
04 |
|
Independent Design Review: Celanese Fiber Operations Superfund Site |
2009 |
Design Stage |
CELANESE CORP. (SHELBY FIBER OPERATIONS) |
SHELBY |
NC |
04 |
|
Remediation System Evaluation: Central City/Clear Creek Superfund Site |
2007 |
Remedy Stage |
CENTRAL CITY, CLEAR CREEK |
IDAHO SPRINGS |
CO |
08 |
|
Streamlined Remediation System Evaluation: Chemko Technical Services, Inc. Facility |
2005 |
Remedy Stage |
CHEMKO TECHNICAL SERVICES, INC. FACILITY |
MIMS |
FL |
04 |
|
Memorandum: Re: Summary of Optimization Activities Provided to EPA Region 2 at the Toms River Ciba |
2012 |
Remedy Stage |
CIBA-GEIGY CORP. |
TOMS RIVER |
NJ |
02 |
|
Streamlined Remediation System Evaluation: Circuitron Corporation Superfund Site |
2005 |
Remedy Stage |
CIRCUITRON CORP. |
EAST FARMINGDALE |
NY |
02 |
|
Long-Term Groundwater Optimization: Clare Water Supply Superfund Site (Permeable Reactive Barrier and Soil Remedy Areas) |
2007 |
Long-term Monitoring Optimization Stage |
CLARE WATER SUPPLY |
CLARE |
MI |
05 |
|
Long-Term Groundwater Monitoring Optimization: Clare Water Supply Superfund Site (StageRight Area) |
2007 |
Long-term Monitoring Optimization Stage |
CLARE WATER SUPPLY |
CLARE |
MI |
05 |
|
Remediation System Evaluation: Claremont Polychemical Superfund Site |
2002 |
Remedy Stage |
CLAREMONT POLYCHEMICAL |
OLD BETHPAGE |
NY |
02 |
|
Remediation System Evaluation: Cleburn Street Well Superfund Site |
2001 |
Remedy Stage |
CLEBURN STREET WELL |
GRAND ISLAND |
NE |
07 |
|
Remediation System Evaluation: Colbert Landfill Superfund Site |
2010 |
Remedy Stage |
COLBERT LANDFILL |
SPOKANE |
WA |
10 |
|
Remediation System Evaluation: South Tacoma Channel/Well 12A Superfund Site |
2001 |
Remedy Stage |
COMMENCEMENT BAY, SOUTH TACOMA CHANNEL |
TACOMA |
WA |
10 |
|
Site Optimization Tracker: Crossley Farm Superfund Site |
2005 |
Design Stage |
CROSSLEY FARM |
HEREFORD TOWNSHIP |
PA |
03 |
|
Site Optimization Tracker: Croydon TCE Site |
2005 |
Remedy Stage |
CROYDON TCE |
CROYDON TOWNSHIP |
PA |
03 |
|
Site Optimization Tracker: Cryochem Superfund Site |
2005 |
Remedy Stage |
CRYOCHEM, INC. |
WORMAN TOWNSHIP |
PA |
03 |
|
Optimization Review (LUST Sites) - Davis Chevrolet/Nav 185 Site |
|
Investigation Stage, Design Stage, Remedy Stage |
DAVIS CHEVROLET/NAV 185 SITE |
Tuba City |
AZ |
09 |
|
Groundwater Monitoring Network Optimization: Delatee Metals Superfund Site |
2009 |
Long-term Monitoring Optimization Stage |
DELATTE METALS |
PONCHATOULA |
LA |
06 |
|
Remediation System Evaluation: Delphi Corporation |
2003 |
Remedy Stage |
DELPHI VOC SITE |
DAYTON |
OH |
05 |
|
Remediation System Evaluation: Douglas Road Landfill |
2004 |
Remedy Stage |
DOUGLASS ROAD/UNIROYAL, INC., LANDFILL |
MISHAWAKA |
IN |
05 |
|
Remedial Design Optimization Review Report - East 67th Street Ground Water Plume NPL Site |
2014 |
Design Stage |
EAST 67TH STREET GROUND WATER PLUME |
ODESSA |
TX |
06 |
|
Remediation System Evaluation: Eastern Surplus Superfund Site |
2011 |
Remedy Stage |
EASTERN SURPLUS |
MEDDYBEMPS |
ME |
01 |
|
Streamlined Remediation System Evaluation: Eaton Corporation Facility |
2005 |
Remedy Stage |
EATON CORP - KEARNEY |
KEARNEY |
NE |
07 |
|
Remediation System Evaluation: Eliskim Facility |
2004 |
Remedy Stage |
ELISKIM FACILITY |
ANDERSON |
SC |
04 |
|
Remediation System Evaluation: Ellis Property Superfund Site |
2006 |
Remedy Stage |
ELLIS PROPERTY |
EVESHAM TOWNSHIP |
NJ |
02 |
|
Remediation System Evaluation: Elmore Waste Disposal Superfund Site |
2001 |
Remedy Stage |
ELMORE WASTE DISPOSAL |
GREER |
SC |
04 |
|
Streamlined Remediation System Evaluation (RSE-Lite) for A Ground Water Pump and Treat System: Engelhard Corporation Facility |
2005 |
Remedy Stage |
ENGELHARD CORPORATION FACILITY |
PLAINVILLE |
MA |
01 |
|
Optimization Review: Fairfield Coal Gasification Plant Superfund Site |
2012 |
Long-term Monitoring Optimization Stage |
FAIRFIELD COAL GASIFICATION PLANT |
FAIRFIELD |
IA |
07 |
|
Remediation System Evaluation: FCX-Statesville Superfund Site |
2002 |
Remedy Stage |
FCX, INC. (STATESVILLE PLANT) |
STATESVILLE |
NC |
04 |
|
Remediation System Evaluation: Former Honeywell Facility |
2003 |
Remedy Stage |
FORMER HONEYWELL FACILITY |
UPPER DUBLIN TOWNSHIP |
PA |
03 |
|
Optimization Review: French Gulch/Wellington-Oro Mine Site Water Treatment Plant |
2013 |
Remedy Stage |
FRENCH GULCH |
BRECKENRIDGE |
CO |
08 |
|
Groundwater Monitoring Network Optimization: Frontier Hard Chrome Superfund Site |
2007 |
Long-term Monitoring Optimization Stage |
FRONTIER HARD CHROME, INC. |
VANCOUVER |
WA |
10 |
|
Remediation System Evaluation: GCL Tie and Treating Superfund Site |
2006 |
Remedy Stage, Remedy Stage |
GCL TIE AND TREATING INC. |
VILLAGE OF SIDNEY |
NY |
02 |
|
Optimization Evaluation: General Motors Former AC Rochester Facility |
2011 |
Investigation Stage, Remedy Stage |
GENERAL MOTORS S.C. |
SIOUX CITY |
IA |
07 |
|
Optimization Review: Gilt Edge Mine Superfund Site, Water Treatment Plant |
2012 |
Design Stage, Remedy Stage |
GILT EDGE MINE |
LEAD |
SD |
08 |
|
Grants Chlorinated Solvents Plume Superfund Site |
2008 |
Design Stage |
GRANTS CHLORINATED SOLVENTS |
GRANTS |
NM |
06 |
|
Optimization Support Evaluation: Greenwood Chemical Site |
2004 |
Remedy Stage |
GREENWOOD CHEMICAL CO. |
NEWTOWN |
VA |
03 |
|
Site Optimization Tracker: Greenwood Chemical Site |
2005 |
Remedy Stage |
GREENWOOD CHEMICAL CO. |
NEWTOWN |
VA |
03 |
|
Remediation System Evaluation: Groveland Wells Superfund Site |
2002 |
Remedy Stage, Remedy Stage |
GROVELAND WELLS |
GROVELAND |
MA |
01 |
|
Remediation System Evaluation: Groveland Wells Superfund Site |
2013 |
Long-term Monitoring Optimization Stage |
GROVELAND WELLS |
GROVELAND |
MA |
01 |
|
Decision Framework for Pump and Treat (P&T) Shutdown Based on Optimization Review |
2013 |
Long-term Monitoring Optimization Stage |
GROVELAND WELLS |
GROVELAND |
MA |
01 |
|
Optimization Review: Hastings Ground Water Contamination Site, Second Street Subsite Operable Units #12 and #20 |
2013 |
Remedy Stage |
HASTINGS GROUND WATER CONTAMINATION |
HASTINGS |
NE |
07 |
|
Site Optimization Tracker: Havertown PCP Site |
2005 |
Remedy Stage |
HAVERTOWN PCP |
HAVERFORD |
PA |
03 |
|
Optimization Support Evaluation: Havertown PCP Site |
2004 |
Remedy Stage |
HAVERTOWN PCP |
HAVERFORD |
PA |
03 |
|
Site Optimization Tracker: Hellertown Manufacturing |
2005 |
Remedy Stage |
HELLERTOWN MANUFACTURING CO. |
HELLERTOWN |
PA |
03 |
|
Remediation System Evaluation: Hellertown Manufacturing Company Superfund Site |
2001 |
Remedy Stage |
HELLERTOWN MANUFACTURING CO. |
HELLERTOWN |
PA |
03 |
|
Remediation System Evaluation: Higgins Farm Superfund Site |
2004 |
Remedy Stage |
HIGGINS FARM |
FRANKLIN TOWNSHIP |
NJ |
02 |
|
An Addendum to the Remediation System Evaluation: Homestake Mining Company (Grants) Superfund Site |
2010 |
Remedy Stage |
HOMESTAKE MINING CO. |
MILAN |
NM |
06 |
|
Memorandum: Re: Technical Assistance for Idaho Pole Site, Bozeman, Montana |
2009 |
Remedy Stage |
IDAHO POLE CO. |
BOZEMAN |
MT |
08 |
|
Long-Term Optimization Review - Intel Magnetics/Micro-Storage Corporation Site |
2013 |
Long-term Monitoring Optimization Stage |
INTEL MAGNETICS |
SANTA CLARA |
CA |
09 |
|
Streamlined Remediation System Evaluation: Intermountain Waste Oil Refinery |
2011 |
Remedy Stage |
INTERMOUNTAIN WASTE OIL REFINERY |
BOUNTIFUL |
UT |
08 |
|
Final Report: Technical Assistance: Kearsarge Metallurgical Corporation Superfund Site |
2009 |
Long-term Monitoring Optimization Stage |
KEARSARGE METALLURGICAL CORP. |
CONWAY |
NH |
01 |
|
Memorandum: Review of the Site Optimization Study, King of Prussia Technical Corporation Site |
2012 |
Long-term Monitoring Optimization Stage |
KING OF PRUSSIA |
WINSLOW TOWNSHIP |
NJ |
02 |
|
Optimization Evaluation: Lee Chemical Superfund Site |
2012 |
Long-term Monitoring Optimization Stage, Long-term Monitoring Optimization Stage |
LEE CHEMICAL |
LIBERTY |
MO |
07 |
|
Remediation System Evaluation: MacGillis & Gibbs Co./Bell Lumber & Pole Co. Superfund Site |
2001 |
Remedy Stage, Remedy Stage |
MACGILLIS & GIBBS CO./BELL LUMBER & POLE CO. |
NEW BRIGHTON |
MN |
05 |
|
Remediation System Evaluation: Mattiace Pertrochemical Superfund Site |
2001 |
Remedy Stage |
MATTIACE PETROCHEMICAL CO., INC. |
GLEN COVE |
NY |
02 |
|
Remediation System Evaluation: McCormick and Baxter Superfund Site |
2002 |
Design Stage, Design Stage, Remedy Stage, Remedy Stage |
MCCORMICK & BAXTER CREOSOTING CO. (PORTLAND PLANT) |
PORTLAND |
OR |
10 |
|
DRAFT Optimization Evaluation: McGaffey and Main Groundwater Plume Superfund Site |
2011 |
Investigation Stage |
MCGAFFEY AND MAIN GROUNDWATER PLUME |
ROSWELL |
NM |
06 |
|
Remediation System Evaluation: Midland Products Superfund Site |
2001 |
Remedy Stage |
MIDLAND PRODUCTS |
OLA/BIRTA |
AR |
06 |
|
Remediation System Evaluation: Millcreek Dump Superfund Site |
2010 |
Remedy Stage, Long-term Monitoring Optimization Stage |
MILL CREEK DUMP |
ERIE |
PA |
03 |
|
Remediation System Evaluation: Modesto Groundwater Contamination Superfund Site |
2001 |
Remedy Stage |
MODESTO GROUND WATER CONTAMINATION |
MODESTO |
CA |
09 |
|
Remediation System Evaluation: Morgan Terminal |
2004 |
Remedy Stage |
MORGAN TERMINAL |
BROOKLYN |
NY |
02 |
|
Remediation System Evaluation: Moss-American Superfund Site |
2011 |
Remedy Stage |
MOSS-AMERICAN CO., INC. (KERR-MCGEE OIL CO.) |
MILWAUKEE |
WI |
05 |
|
Optimization Review - Naval Base Kitsap OU-1 |
2013 |
Investigation Stage |
NAVAL UNDERSEA WARFARE ENGINEERING STATION (4 WASTE AREAS) |
KEYPORT |
WA |
10 |
|
Long-Term Groundwater Monitoring Optimization: Newark, Muscoy, and Source Operable Units Newmark Superfund Site |
2007 |
Remedy Stage |
NEWMARK GROUND WATER CONTAMINATION |
SAN BERNARDINO |
CA |
09 |
|
Site Optimization Tracker: North Penn Area 1 Superfund Site |
2005 |
Remedy Stage |
NORTH PENN - AREA 1 |
SOUDERTON |
PA |
03 |
|
Optimization Evaluation: North Penn Area 6 Superfund Site |
2012 |
Remedy Stage |
NORTH PENN - AREA 6 |
LANSDALE |
PA |
03 |
|
Remediation System Evaluation: Northwest Pipe and Casing Site |
2007 |
Remedy Stage |
NORTHWEST PIPE & CASING/HALL PROCESS COMPANY |
CLACKAMAS |
OR |
10 |
|
Remediation System Evaluation: Former Occidental Facility |
2004 |
Investigation Stage, Remedy Stage |
OCCIDENTAL CHEMICAL CORPORATION |
TACOMA |
WA |
10 |
|
Remediation System Evaluation: Oconomowoc Electroplating Superfund Site |
1997 |
Remedy Stage |
OCONOMOWOC ELECTROPLATING CO., INC. |
ASHIPPIN |
WI |
05 |
|
Optimization Review: Ogallala Ground Water Contamination Superfund Site, Operable Unit 2 (Tip Top Cleaners) |
2013 |
Investigation Stage, Remedy Stage |
OGALLALA GROUND WATER CONTAMINATION |
OGALLALA |
NE |
07 |
|
Streamlined Optimization Review - Old Hilltop (Hilltop Station) Underground Storage Tank Site |
2013 |
Investigation Stage, Investigation Stage, Design Stage, Design Stage |
OLD HILLTOP (HILLTOP STATION) |
ROOSEVELT |
UT |
08 |
|
Remediation System Evaluation: Ott/Story/Cordova Superfund Site |
2002 |
Remedy Stage |
OTT/STORY/CORDOVA CHEMICAL CO. |
DALTON TOWNSHIP |
MI |
05 |
|
Optimization Review (LUST Sites) - Painted Desert Inn / NAV 049 Site |
|
Investigation Stage, Design Stage, Remedy Stage |
PAINTED DESERT INN / NAV 049 SITE |
NAVAJO |
AZ |
09 |
|
Optimization Review: Palermo Wellfield Superfund Site |
2011 |
Remedy Stage, Remedy Stage |
PALERMO WELL FIELD GROUND WATER CONTAMINATION |
TUMWATER |
WA |
10 |
|
Optimization Review: Peck Iron and Metal Superfund Site |
2013 |
Investigation Stage |
PECK IRON AND METAL |
PORTSMOUTH |
VA |
03 |
|
Remediation System Evaluation: Peerless Plating Site |
2006 |
Remedy Stage |
PEERLESS PLATING CO. |
MUSKEGON |
MI |
05 |
|
Remediation System Evaluation: Pemaco Superfund Site |
2011 |
Remedy Stage |
PEMACO MAYWOOD |
MAYWOOD |
CA |
09 |
|
Remediation System Evaluation: Penta Wood Products Site |
2006 |
Remedy Stage |
PENTA WOOD PRODUCTS |
DANIELS |
WI |
05 |
|
Streamlined Optimization Review - Pine Ridge Oil Underground Storage Tank Site |
|
Investigation Stage, Design Stage, Remedy Stage |
PINE RIDGE OIL UNDERGROUND STORAGE TANK SITE |
PINE RIDGE |
SD |
08 |
|
Remediation System Evaluation: Raymark Superfund Site |
2001 |
Remedy Stage |
RAYMARK |
HATBORO |
PA |
03 |
|
Site Optimization Tracker: Raymark |
2005 |
Remedy Stage |
RAYMARK |
HATBORO |
PA |
03 |
|
Remediation System Evaluation: Reilly Tar & Chemical Corp. (Indianapolis Plant) Site |
2004 |
Remedy Stage |
REILLY TAR & CHEMICAL CORP. (INDIANAPOLIS PLANT) |
INDIANAPOLIS |
IN |
05 |
|
Optimization Evaluation: Sidney and Richardson Hill Road Landfills |
2012 |
Investigation Stage, Remedy Stage |
RICHARDSON HILL ROAD LANDFILL/POND |
SIDNEY CENTER |
NY |
02 |
|
Remediation System Evaluation: Risdon Corporation |
2004 |
Remedy Stage |
RISDON CORPORATION |
THOMASTON |
CT |
01 |
|
Site Optimization Tracker: Saunders Supply Company Superfund Site |
2005 |
Remedy Stage |
SAUNDERS SUPPLY CO. |
CHUCKATUCK |
VA |
03 |
|
Remediation System Evaluation: Savage Municipal Water Supply Superfund Site |
2001 |
Remedy Stage |
SAVAGE MUNICIPAL WATER SUPPLY |
MILFORD |
NH |
01 |
|
Remediation System Evaluation: Selma Pressure Treating Superfund Site |
2002 |
Remedy Stage |
SELMA TREATING CO. |
SELMA |
CA |
09 |
|
Remediation System Evaluation: Shorco South |
2004 |
Remedy Stage |
SHORCO SOUTH |
MAHWAH |
NJ |
02 |
|
Optimization Evaluation: Sidney and Richardson Hill Road Landfills |
2012 |
Investigation Stage, Remedy Stage |
SIDNEY LANDFILL |
SIDNEY |
NY |
02 |
|
Remediation System Evaluation: Silresim Superfund Site |
2001 |
Remedy Stage |
SILRESIM CHEMICAL CORP. |
LOWELL |
MA |
01 |
|
Remediation System Evaluation: SMS Instruments |
2003 |
Remedy Stage |
SMS INSTRUMENTS, INC. |
DEER PARK |
NY |
02 |
|
Final Report: Technical Assistance: Somersworth Sanitary Landfill Superfund Site |
2009 |
Long-term Monitoring Optimization Stage |
SOMERSWORTH SANITARY LANDFILL |
SOMERSWORTH |
NH |
01 |
|
Site Optimization Tracker: Standard Chlorine of Delaware Superfund Site |
2006 |
Remedy Stage |
STANDARD CHLORINE OF DELAWARE, INC. |
NEW CASTLE |
DE |
03 |
|
Optimization Review - State Road 114 Ground Water Plume Superfund Site |
2013 |
Remedy Stage |
STATE ROAD 114 GROUNDWATER PLUME |
LEVELLAND |
TX |
06 |
|
Memorandum: Re: Concept Review for Modifying Landfill Gas Venting at Stoughton City |
2007 |
Remedy Stage |
STOUGHTON CITY LANDFILL |
STOUGHTON |
WI |
05 |
|
Remediation System Evaluation: Summitville Mine Superfund Site |
2002 |
Remedy Stage |
SUMMITVILLE MINE |
RIO GRANDE COUNTY |
CO |
08 |
|
Technical Assistance for the Gilson Road Superfund Site |
2009 |
Long-term Monitoring Optimization Stage |
SYLVESTER |
NASHUA |
NH |
01 |
|
Long-Term Groundwater Monitoring Optimization: Taylor Road Landfill Superfund Site |
2007 |
Long-term Monitoring Optimization Stage |
TAYLOR ROAD LANDFILL |
SEFFNER |
FL |
04 |
|
Optimization Review (LUST Sites) - Telles Ranch/CRIT 002 |
|
Design Stage, Remedy Stage |
TELLES RANCH/CRIT 002 |
POSTON |
AZ |
09 |
|
Remediation System Evaluation: Tutu Wellfield Superfund Site |
2011 |
Remedy Stage |
TUTU WELLFIELD |
TUTU |
VI |
02 |
|
Optimization Review: Valley Park TCE Superfund Site |
2013 |
Investigation Stage, Long-term Monitoring Optimization Stage |
VALLEY PARK TCE |
VALLEY PARK |
MO |
07 |
|
Optimization Review: Velsicol Chemical Corporation, Hardeman County Landfill Superfund Site |
2013 |
Design Stage |
VELSICOL CHEMICAL CORP. (HARDEMAN COUNTY) |
TOONE |
TN |
04 |
|
Remediation System Evaluation: Vineland Chemical Company Superfund Site |
2011 |
Remedy Stage, Remedy Stage |
VINELAND CHEMICAL CO., INC. |
VINELAND |
NJ |
02 |
|
Streamlined Remediation System Evaluation: Wash King Laundry Superfund Site |
2011 |
Remedy Stage |
WASH KING LAUNDRY |
PLEASANT PLAINS TWP |
MI |
05 |
|
Long-Term Monitoring Network Optimization Evaluation |
2006 |
Long-term Monitoring Optimization Stage |
WASH KING LAUNDRY |
PLEASANT PLAINS TWP |
MI |
05 |
|
Independent Design Review: Woolfolk Chemical Works, Inc. Superfund Site |
2008 |
Design Stage |
WOOLFOLK CHEMICAL WORKS, INC. |
FORT VALLEY |
GA |
04 |
|
Remediation System Evaluation: Wyckoff/Eagle Harbor Superfund Site (Soil and Ground Water Operable Units) |
2005 |
Remedy Stage |
WYCKOFF CO./EAGLE HARBOR |
BAINBRIDGE ISLAND |
WA |
10 |